PUBLIC PROCUREMENT ACT

CENTER FOR LAWS OF NIGERIA: FEDERAL LAWS

Constitution Federal Laws Treaties
State Laws Court Judgments Court Rules
DOWNLOAD OF A COPY OF THIS LAW IS AVAILABLE [N1,500 (PDF)] CLICK HERE FOR ONLINE PAYMENT. PDF COMPENDIUMS OF ALL THE LAWS OF NIGERIA, LAGOS AND OTHER STATES ARE ALSO AVAILABLE. EMAIL: lawnigeria@gmail.com or info@lawnigeria or Text/WhatsApp +23407067102097

DOWNLOAD (PDF-N1500)

 

LAWS OF THE FEDERATION OF NIGERIA

PUBLIC PROCUREMENT ACT

 

EXPLANATORY MEMORANDUM

This Act was enacted to establish the National Council on Public Procurement and the Bureau of Public Procurement as the regulatory authorities responsible for the monitoring and oversight of public procurement, harmonizing the existing government policies and practices by regulating, setting standards and developing the legal framework and professional capacity for public procurement in Nigeria; and for related matters.

 

ARRANGEMENT OF SECTIONS

PART I – ESTABLISHMENT OF NATIONAL COUNCIL ON PUBLIC PROCUREMENT

  1. Establishment of the National Council on Public Procurement and its membership.
  2. Functions of the Council.

PART II – ESTABLISHMENT OF THE BUREAU OF PUBLIC PROCUREMENT

  1. The establishment of the Bureau of Public Procurement.
  2. Objectives of the Bureau.
  3. Functions of the Bureau.
  4. Powers of the Bureau.
  5. Director-General and  staff of the Bureau.
  6. Principal officers of the Bureau.
  7. Other staff of the Bureau.
  8. Staff regulations.
  9. Pension provisions.
  10. Funds of the Bureau.
  11. Financial year, budgeting and annual report.
  12. Legal proceedings.

PART III – SCOPE OF APPLICATION

  1. Scope of application.

PART IV – FUNDAMENTAL PRINCIPLES FOR PROCUREMENTS.

  1. Fundamental Principles for Procurement.

PART V – ORGANISATION OF PROCUREMENTS

  1. Approving authority.
  2. Procurement planning.
  3. Procurement implementation.
  4. Accounting officer.
  5. Procurement planning committee.
  6. Tenders board.
  7. Pre-qualification of bidders.
  8. Open competitive bidding.

PART VI – PROCUREMENT METHODS (GOODS AND SERVICES)

  1. Invitations to bid.
  2. Bid security.
  3. Submission of bids.
  4. Rejection of bids.
  5. Validity period of bids, modification and withdrawal of tenders.
  6. Bid opening.
  7. Examination of bids.
  8. Evaluation of bids.
  9. Acceptance of bids.
  10. Domestic preferences.
  11. Mobilization fees.
  12. Contract performance guarantee.
  13. Interest on delayed payments.
  14. Record of procurement proceedings.

PART VII-SPECIAL AND RESTRICTED METHODS OF PROCUREMENT

  1. Two stage tendering.
  2. Restricted tendering.
  3. Request for quotations.
  4. Direct procurement.
  5. Emergency procurements.

PART VIII-PROCUREMENT OF CONSULTANT (SERVICES)

  1. Expressions of interest to provide services for ascertained needs.
  2. Request for proposals to provide services for unascertained needs.
  3. Content of the requests for proposals.
  4. Clarification and modification of requests for proposals.
  5. Submission of proposals.
  6. Criteria for evaluation of proposals.
  7. General selection procedure (services).
  8. Procedure for selection of proposal where price is a factor.
  9. Selection procedure where price is not a factor.

PART IX-PROCUREMENT SURVEILLANCE AND REVIEW

  1. Bureau to recommend investigation.
  2. Administrative Review.

PART X-DISPOSAL OF PUBLIC PROPERTY

  1. Disposal of public property.
  2. Planning of disposals.

PART XI – CODE OF CONDUCT

  1. Code of conduct for public procurement.

PART XII- OFFENCES

  1. Offences relating to public procurement.

PART XIII-MISCELLANEOUS

  1. Miscellaneous.
  2. Interpretation.
  3. Short title.

  

PUBLIC PROCUREMENT ACT, 2007

An Act to establish the National Council on Public Procurement and the Bureau of Public Procurement as the regulatory authorities responsible for the monitoring and oversight of public procurement, harmonizing the existing government policies and practices by regulating, setting standards and developing the legal framework and professional capacity for public procurement in Nigeria; and for related matters.

(COMMENCEMENT               [4th Day of June, 2007])

ENACTED by the National Assembly of the Federal Republic of Nigeria:

PART I – ESTABLISHMENT OF NATIONAL COUNCIL ON PUBLIC PROCUREMENT

Establishment of the National Council on Public Procurement and its membership.

  1. (1) There is established the National Council on Public Procurement (in this Act referred to as “the Council”).

(2)    The Council shall consist of:

(a)    the Minister of Finance as Chairman

(b)   the Attorney-General and Minister of Justice of the Federation

(c)   the Secretary to the Government of the Federation

(d)   the Head of Service of the Federation;

(e)   the Economic Adviser to the President

(f)      six part-time members to represent;

(i)     Nigeria Institute of Purchasing and Supply Management

(ii)    Nigeria Bar Association;

(iii)    Nigeria Association of Chambers of Commerce, Industry, Mines and Agriculture ;

(iv)   Nigeria Society of Engineers ;

(v)    Civil Society;

(vi)   the Media; and

(g)    the Director-General of the Bureau who shall be the Secretary of the Council.

(3)   Notwithstanding the provisions of Section (2), the council may co-opt any person to attend its meeting but the person so co-opted shall not have a casting vote or be counted towards quorum.

(4)    The  Chairman  and  other  members  of  the  Council  shall  be  appointed  by  the President.

(5)   Subject to subsection (2) of this Section a  member of the  Council being;

(a)   the holder of an elective office under the Constitution of Nigeria, shall hold office for a period he remains so elected and no more; and

(b)   the Director-General of the Bureau, shall hold office on such terms and conditions as may be specified in his letter of appointment.

 

Functions of the Council.

  1. The Council shall:

(a)  consider, approve and amend the monetary and prior review thresholds  the Council. for the application of the provisions of this Act by procuring entities;

(b)    consider and approve policies on public procurement;

(c)    approve the appointment of the Directors of the Bureau

(d)  receive and consider, for approval, the audited accounts of the Bureau of Public Procurement ; and

(e)  “approve changes in the procurement process to adapt to improvements in modern technology”

(f)    give such other directives and perform such other functions as may be necessary to achieve the objectives of this Act.

PART II – ESTABLISHMENT OF THE BUREAU OF PUBLIC PROCUREMENT

The establishment of the Bureau of Public Procurement.

3 (1) There is established an agency to be known as the Bureau of Public Procurement in this Act referred to as “the Bureau”.

(2)    The Bureau :

(a)    shall be a body corporate with perpetual succession and a common seal;

(b)    may sue and be sued in its corporate name ; and

(c)    may acquire, hold or dispose of any property, movable or immovable for the purpose of carrying out any of its functions under this Act.

 

Objectives of the Bureau.

  1. The objectives of the Bureau are:

(a)   the harmonization of existing government policies and practices on public procurement and ensuring probity, accountability and transparency in the procurement process ;

(b)   the establishment of pricing standards and benchmarks;

(c)  ensuring the application of fair, competitive, transparent, value-for-money standards and  practices for the procurement  and disposal of public assets and services; and

(d) the attainment of transparency, competitiveness, cost effectiveness and professionalism in the public sector procurement system.

 

Functions of the Bureau.

  1. The Bureau shall :

(a) formulate the general policies and guidelines relating to public sector procurement for the approval of the Council ;

(b) publicize and explain the provisions of this Act;

(c) subject to thresholds as may be set by the Council, certify Federal procurement prior to the award of contract ;

(d) supervise the implementation of established procurement policies;

(e) monitor the prices of tendered items and keep a national database of standard prices;

(f) publish the details of major contracts in the procurement journal ;

(g) publish paper and electronic editions of the procurement journal and maintain an archival system for the procurement journal ;

(h) maintain a national database of the particulars and classification and categorization of federal contractors and service providers;

(i)  collate and maintain in an archival system, all federal procurement plans and information ;

(j)    undertake procurement research and surveys :

(k)   organize training and development programmes for procurement professionals ;

(l)  periodically review the socio-economic effect of the policies on procurement and advise the Council accordingly ;

(m) prepare and update standard bidding and contract documents ;

(n)    prevent fraudulent and unfair procurement and where necessary apply administrative sanctions;

(0) review the procurement and award of contract procedures of every entity to which this Act applies;

(p) perform procurement audits and submit such report to the National Assembly bi-annually;

(q) introduce, develop, update and maintain related database and technology;

(r)    establish a single internet portal that shall, subject to Section 16 (21) to this Act serve as a primary and definitive source of  all  information on government procurement containing and displaying all public sector procurement information at all times; and

(s)    co-ordinate relevant training programs to build institutional capacity.

 

Powers of the Bureau.

6.- (1) The Bureau shall have the power to :

(a)    enforce the monetary and prior review thresholds set by the Council for the application of the        provisions of this Act by the procuring entities;

(b)            subject to the paragraph (a) of this subsection, issue certificate of “No Objection” for Contract Award” within the prior review threshold for all procurements within the purview of this Act :

(c)            from time to time stipulate  to  all procuring    entities   the  procedures    and documentation pre- requisite for the issuance of Certificate of ‘No Objection’ under this Act;

(d)   where a reason exist:

(i)    cause to  be  inspected  or reviewed any procurement transaction to ensure compliance with the provisions of this Act,

(ii)   review and determine whether any procuring entity has violated any provision of this Act;

(e)            debar any supplier, contractor or service provider that contravenes any provision of this Act and regulations made pursuant to this Act ;

(f)    maintain a national database of federal contractors and service providers and to the exclusion of all procuring entities prescribe classifications and categorizations for the companies on the register ;

(g)    maintain a list of firms and persons that have been debarred from participating in public procurement activity and publish them in the procurement journal ;

(h)    call for such information, documents, records and reports in respect of any aspect of any    procurement  proceeding  where  a  breach,  wrongdoing,  default, mismanagement and or collusion has been alleged, reported or proved against a procuring entity or service provider ;

(i)     recommend to the Council, where there are persistent or serious breaches of this Act or  regulations or guidelines made under this Act for .

(i)     the suspension of officers concerned with the procurement or disposal proceeding in issue ;

(ii)   the replacement of the head or any of the members of the procuring or disposal unit of any entity or the Chairperson of the Tenders Board as the case  may be ;

(iii)    the discipline of the Accounting Officer of any procuring entity ;

(iv)   the temporary transfer of the procuring and disposal function of a procuring and disposing entity to a third party procurement agency or consultant ; or

(v)            any other sanction that the Bureau may consider of appropriate ;

(j)    call for the production of books of accounts, plans, documents, and examine persons or parties in connection with any procurement proceeding ;

(K)   act upon complaints in accordance with the procedures set out in this Act ;

(j)    nullify the whole or any part of any procurement proceeding or award which is in contravention of this Act ;

(m)           do such other things as are necessary for the efficient performance of its functions under this Act;

(2)    The Bureau shall serve as the Secretariat for the Council.

(3)   The Bureau shall, subject to the approval of the Council, have power to

(a)   enter into contract or partnership with any company, firm or person which in its opinion will facilitate the discharge of its functions ;

(b)   request for and obtain from any procurement entity information including  reports, memoranda and audited accounts, and other information relevant to its functions under this Act; and

(c)            liaise with relevant bodies or institutions national and international  for effective performance of its functions under this Act.

 

Director-General and staff of the Bureau.

7.- (1) There shall be for the Bureau, a Director-General who shall be appointed by the  President, on the recommendation of the Council after competitive selections.

(2)            The ‘Director-General shall be:

(a)            the Chief Executive and accounting officer of the Bureau

(b)            responsible for  the  execution of  the  policy and day to day administration of the affairs of the Bureau; and

(c)            a person who possesses  the  relevant and  adequate  professional qualification and shall have been so qualified for a period of not less than 15 years.

(3)            The Director-General shall hold office:

(a)            for a term of 4 years in the first instance and may be re-appointed for a further term of 4 years and no more ; and

(b)            on such terms and conditions as may be specified in his letter of appointment.

(4)    Without  prejudice  to  the  provisions  of  this  Act,  the  Director- General of the Bureau may be removed from office at the instance of the President  on  the  basis  of  gross  misconduct  of  financial  impropriety, fraud, and manifested incompetence proven by the Council.

 

Principal officers of the Bureau.

8.-(1) The Council shall appoint the principal officers for the Bureau after competitive selection process.

(2)            The principal officers appointed under Section 9 (1) of this Section shall each have the requisite qualification and experience required for the effective performance of the functions of their respective Departments and the Bureau as specified under this Act.

(3)    The Council shall have power to modify the operational structure of the Bureau as may be necessary to enhance the Bureau’s duties and functions under this Act.

 

Other staff of the Bureau.

9.-(1)        The Council may appoint such officers and other employees as may, from time to time, deemed necessary for the purposes of the Bureau.

(2)            Subject to the Pension Reform Act, the terms and conditions of service (including remuneration, allowances, benefits and pensions) of officers and employees  of the Bureau shall  be as  determined by the Council.

(3)    Without prejudice to the generality of subsection this Section, the Council shall have power to appoint either on transfer or on secondment from any public service in the Federation, such number of employees as may, be required to assist the Bureau in the discharge of any of its functions under the Act and persons so employed shall be remunerated (including allowances) as the Council may consider appropriate.

 

Staff regulations.

10.-(1) The Council may, subject to the provisions of this Act and within six months of the inauguration, make staff regulations relating generally to the conditions of service of the employees of the Bureau and without prejudice to the foregoing, such regulations may provide for :

(a)    the appointment, promotion and disciplinary control (including dismissal) of employees of the Bureau ; and

(b)   appeal by such employees against dismissal or other disciplinary measures.

(2)   Until such regulations are made, any instrument relating to the conditions of service of officers in the civil service of the Federation shall be applicable.

 

Pension provisions.

  1. Employees of the Bureau shall be entitled to pensions, and other provisions as prescribed under the Pension Act.

 

Funds of the Bureau.

12.-(1) The Bureau shall establish and maintain a Fund to be approved by the Council into which shall be paid and credited:

(a)            the sums appropriated by the National Assembly for the running of the Bureau ;

(b)    all subventions, fees and charges for services rendered or publications  made by the Bureau ; and

(c)    all other assets which may from time to time accrue to the Bureau.

(2)   The Bureau shall charge its fund to meet all its expenditure.

(3)   The Council may make regulations for the Bureau:

(a)    specifying the manner in which assets or the fund of the Bureau are to be held, and regulating the making of payment into and out of the fund; and

(b)   requiring the keeping of proper accounts and records for the purposes of  the fund in such form as may be specified in the rules.

(4)   The Bureau may, from time to time, apply the proceeds of the fund for:

(a)   the cost of administration of the Bureau;

(b)   the payments of salaries, fees and other remuneration, employees of the Bureau or experts or professionals appointed by the Bureau ;

(c)   the maintenance of any property acquired by or vested in the Bureau; and

(d)    any matter connected with all or any of the functions of the Bureau under this Act.

(e)   the payments of salaries, fees, and other remuneration, of employees of the Bureau or experts or professionals appointed by the Bureau ; and

(f)    any expenditure connected with all or any of the functions of the Bureau under this Act.

 

Financial year, budgeting and annual report.

13.-(1) The financial year of the Bureau shall be the same as that of the Federal Financial Government.

(2)    Not later than 6 months before the end of the financial year, the Bureau shall submit to the Council  an  estimate of its expenditure and projected income during the next succeeding year.

(3)    The Bureau shall keep proper accounts and records of its receipts, payments, assets and liabilities and shall in respect of each financial year prepare a statement of account in such form as the Council may direct.

(4)    The Bureau shall within 6 months after the end of the financial year to which the accounts relate cause the accounts to be audited in accordance with guidelines supplied by the Auditor-General of the Federation.

(5)    The  Bureau  shall  at  the end  of each financial year,  prepare and submit to the Council a report in such form as shall accurately capture all the activities of the Bureau during the preceding year and shall include in the report a copy of the audited accounts of the Bureau for that year.

 

Legal proceedings.

14.-(1) Subject   to  the   provisions    of  this  Act,   no   suit  shall  be   Legal commenced against the Bureau before the expiration of 30 days after written  notice of an intention to commence the suit shall have been served upon the Bureau by, the intending plaintiff or his agent; and the notice shall clearly and explicitly state .

(a)    the cause of action ;

(b)    the particulars Of the claim;

(c)    the name and address of legal practitioner of the intending  plaintiff; and

(d)    the relief being sought.

(2)     The  Director-General  of  the  Bureau,  its  officers,  employees  or agents shall not personally be subject to any action, claim or demand by, or liable to any person in respect of anything done or omitted to be done in exercise of any functions or power conferred by this Act upon the Bureau, its Director-General, officers, employees or agents.

(3)    A member of the Bureau or the Director-General or any officer or employee of the Bureau shall be indemnified out of the assets of the Bureau against any liability incurred by him in defending any proceeding, whether civil or criminal, if the proceeding is brought against him in his capacity as a member, Director-General, officer or other employee of the Bureau.

(4)    A notice, summons or other documents required or authorized to be served upon the Bureau under the provisions of this Act or any other law enactment  may  be  served  by  delivering  it  to  the  Director-General  or  by sending it by registered post and addressed to the Director-General at the principal office of the Bureau.

 

PART III – SCOPE OFAPPLICATION

Scope of application.

15.-(1) The provisions of this Act shall apply to all procurement of goods, works, and services carried out by:

(a)    the Federal Government of Nigeria and all procurement entities;

(b)    all entities outside the foregoing description which derive at least 35% of the  funds    appropriated     or  proposed     to  be   appropriated     for  any   type   of  procurement described in this Act from the Federation share of Consolidated Revenue Fund.

(2)    The provisions of this Act shall not apply to the procurement of special goods; works and services involving national defense or national security unless the President’s express approval has been first sought and obtained.

 

PART IV – FUNDAMENTAL PRINCIPLES  FOR  PROCUREMENTS

Fundamental Principles for Procurement.

16.-(1) Subject to any exemption allowed by this Act, all public procurement shall be        conducted :

(a)    subject to the prior review thresholds as may from time to time be set by the Bureau pursuant to Section 7(1) (a)-(b);

(b)    based only on procurement plans supported by prior budgetary appropriations and no procurement  proceedings shall be formalized until the procuring entity has ensured that funds are available to meet the obligations and  subject  to  the  threshold  in  the  regulations  made  by  the  Bureau,  has  obtained  a “Certificate of ‘ No Objection’ to Contract Award” from the Bureau;

(c)    by open competitive bidding ;

(d)    in a  manner which is transparent, timely, equitable for ensuring accountability and conformity with this Act and regulations deriving there from ;

(e)    with the aim of achieving value for money and fitness for purpose ;

(f)    in a manner which promotes competition, economy and efficiency; and

(g)   in accordance with the procedures and time-line laid down in this Act and as may be specified by the Bureau from time to time.

(2)    Where the Bureau has set prior review thresholds in the procurement regulations, no funds shall be disbursed from the Treasury or Federation Account or any bank account of any procuring entity for any procurement falling above the set thresholds unless the cheque, payments or other form of request for payments is accompanied by a certificate of “No Objection” to an award of contract duly issued by the Bureau.

(3)    For all cases where the Bureau shall set a prior review threshold. the Bureau shall prescribe by regulation, guidelines and the conditions precedent to the award of Certificate of “No Objection” under this Act.

(4)    Subject to the prior review thresholds as may be set by the Bureau, any procurement purported to be awarded without a “Certificate of ‘No Objection’ to Contract Award” duly issued by the Bureau shall be null and void.

(5)    A supplier, contractor or service provider may be a natural person, a legal person or a combination of the two. Suppliers, contractors or service providers acting jointly are jointly and severally liable for all obligations and or  responsibility arising from this Act and the non-performance or improper performance of any contract awarded pursuant to this Act.

(6)    All bidders in addition to requirements contained in any solicitation documents shall:

(a)    possess the necessary;

(i)     professional and technical qualifications to carry out particular  procurements ;

(ii)   financial capability ;

(iii)  equipment and other relevant infrastructure ;

(iv)   shall have adequate personnel to perform  the  obligations of the procurement contracts.

(b)   possess the legal capacity to enter into the procurement contract;

(c)   not be  in  receivership,  the  subject  of  any  form  of  insolvency or bankruptcy proceedings  or the subject of any form of winding up petition or proceedings;

(d)    have fulfilled all its obligations to pay taxes, pensions and social security contributions

(e)    not have any director who has been convicted in any country for any criminal  offence  relating  to  fraud  or  financial  impropriety  or  criminal  misrepresentation  or falsification off acts relating to any matter;

(f)   accompany every bid with an affidavit disclosing whether or not any officer of the relevant committees of the procurement entity or Bureau is a former or present director, shareholder or has any pecuniary interest in the bidder and confirm that all information presented in its bid are true and correct in all particulars.

(7)    The procuring entity may require a bidder to provide documentary evidence or other information it considers necessary as proof that the bidder is qualified in accordance with this Act and the solicitation documents and for this purpose any such requirements shall apply equally to all bidders.

(8)   Whenever  it  is  established  by  a  procuring  entity  or  the  Bureau  that  any  or  a combination of the situations set out exist, a bidder may have its bid or tender excluded from any particular procurement proceeding if :

(a)     there is verifiable evidence that any supplier, contractor or consultant has given or promised  a  gift  of  money  or  any  tangible  item,  or  has  promised,  offered  or  given employment or any other benefit, item or a service that can be quantified in monetary terms to a current or former employee of a procuring entity or the Bureau, in an attempt to influence any action, or decision making of any procurement activity;

(b)   a supplier, contractor or consultant  during   the last three  years  prior to  the commencement of the procurement proceedings in issue, failed to perform or to provide due care in performance of any public procurement ;

(c)    the bidder is in receivership or is the subject of any type of insolvency proceedings or if being a private company under the Companies and Allied Matters Act, is controlled by a. person or persons who are subject to any bankruptcy proceedings or who have been declared bankrupt and or have made any compromises with their creditors within two calendar-years prior to the initiation of the procurement proceeding;

(d)    the bidder is in arrears regarding payment of due taxes, charges, pensions, or social insurance contributions, unless such bidders have obtained a lawful permits with respect to  allowance,   difference   of  such   outstanding   payments    or  payment    thereof   in installments;

(e)    the bidder has been validly sentence for a crime committed in connection with a procurement proceeding, or any other crime committed to gain financial profit;

(f)    the bidder has in its management or is in any portion owned by any person that has been   validly sentence   for  a crime   committed    in  connection   with  a  procurement proceeding, or other crime committed to gain financial profit ; and

(g)   the  bidder  fails  to  submit  a  statement  regarding  its  dominating  or  subsidiary relationships with respect to other parties to the proceedings and persons acting on behalf of the procuring entity participating in same proceeding or whom remains in subordinate relationship with other participants to the proceedings.

(9)   In such cases the procuring entity shall inform the Bureau and person referred to in subsection (8) (a)-(g) of this Section, in writing that the bid or tender in question has been excluded and the grounds for the exclusion and to keep a record of same in the file pertaining to the public procurement proceeding in question.

(10)  All communications and documents issued by procuring entities and the Bureau shall be in English language.

(11)  All communications regarding any matter deriving from this Act or proceedings of public procurement shall be in writing or such other form as may be stipulated by the Bureau.

(12) Every procuring entity shall maintain both file and electronic records of all procurement proceedings made within each financial year and the procurement records shall be maintained for a period often years from the date of the award.

(13) Copies of all procurement records shall be transmitted to the Bureau not later than 3 months after the end of the financial year and shall show:

(a)    information identifying the procuring entity and the contractors

(b)    the date of the contract award ;

(c)    the value of the contract : and

(d)    the detailed records of the procurement proceedings.

(14) All unclassified procurement records shall be open to inspection by the public at the cost of copying and certifying the documents plus an administrative charge as may be prescribed from time to time by the Bureau.

(15)  The criteria stipulated as the basis upon which suppliers or contractors would be  evaluated shall not be changed in the course of any procurement proceeding.

(16)  The burden  of proving  fulfillment of the  requirements  for participation in  any procurement proceeding shall lie on the supplier or contractor.

(17) A contract shall be awarded to the lowest evaluated responsive bid from the bidders substantially responsive to the bid solicitation.

(18)  Notwithstanding subsection (16) of this Section, the Bureau may refuse to issue a ‘Certificate of “No Objection” to Contract Award’ on the grounds that the price is excessive.

(19)  Pursuant to subsection (17) of this Section, the Bureau may direct either that the procurement proceedings be entirely cancelled or that the procuring entity conduct a re-tender.

(20) Pursuant to subsection (18) of this Section, the Bureau may either direct that the procurement proceedings be entirely cancelled or that the procuring entity conduct a re-tender.

(21)  The  accounting  officer  of  a  procuring  entity  and  any  officer to  whom responsibility  is delegated  are  responsible and  accountable for  any  actions taken  or omitted to be taken either in compliance with or in contravention of this Act.

(22) The accounting officer of a procuring entity has the responsibility to ensure that the provisions of this Act and the regulations laid down by the Bureau are complied with, and concurrent approval by any Tenders Board shall not absolve the accounting officer from accountability for anything done in contravention of this Act or the regulations laid down hereunder.             ..

(23) Procurement and disposal decisions of a procuring entity shall be taken in strict adherence to the provisions of this Act and any regulations as may from time to time be laid down by the Bureau.

(24)  Persons who have been engaged in preparing for a procurement or part of the proceedings thereof may neither bid for the procurement in question or any part thereof either as main contractor or sub-contractor nor may they cooperate in any manner with bidders in the course of preparing their tenders.

(25) A procuring entity shall not request or stipulate that a bidder should engage a particular  subcontractor   as  a  requirement    for participating   in any   procurement proceedings.

(26) All procurement contracts shall contain provisions for arbitral proceedings as the primary forms of dispute resolution.

(27) The values in procurement documents shall be stated in Nigerian currency and where stated in a foreign currency shall be converted to Nigerian currency using the exchange rate of the Central Bank of Nigeria valid on the day of opening a tender or bid.

(28) All procurement contracts shall contain warranties for durability of goods, exercise of requisite skills in service provision and use of genuine materials and inputs  in execution.

 

PART V-ORGANISATION OF PROCUREMENTS

Approving authority.

  1. Subject to the monetary and prior review thresholds for procurement in this Act as may from time to time be determined by the Council, the following shall be the approving authority for the conduct of public procurement:

(a)    in the case of:

(i)     a government agency parastatal, or corporation, a Parastatals Tenders Board ; and

(ii)    a ministry or extra-ministerial entity, the Ministerial Tender Board.

 

Procurement planning.

  1. Subject to regulations as may from time to time be made by the Bureau of Procurement under the direction of the Council, a procuring entity shall plan its procurement –

(a)    preparing the needs assessment and evaluation;

(b)    identifying the goods, works or services required;

(c)    carrying appropriate market and statistical surveys and on that basis prepare analysis of the cost implications of the proposed procurement;

(d)    aggregating its requirements whenever possible, both within the procurement entity and between procuring entities, to obtain economy of scale and reduce procurement cost;

(e)    integrating its procurement expenditure into its yearly budget ;

(f)     prescribing any method for effecting the procurement subject to the necessary  approval under this Act; and

(g)    ensuring that the procurement entity functions stipulated in this Section shall be carried out by the Procurement Planning Committee.

 

Procurement implementation.

  1. Subject to regulations as may from time to time be made by the Procurement Bureau, under direction of Council, a procuring entity shall, in implementing its implementation procurement plans:

(a)    advertise and solicit for bids in adherence to this Act and guidelines as may  be issued by the Bureau from time to time;

(b)    to  invite  two  credible  persons  as  observers  in  every  procurement process  one person each representing a recognized ;

(i)     private sector professional organization whose expertise is relevant the particular goods or service being  procured, and

(ii)   non-governmental organisation working in transparency, accountability and anti-corruption areas, and the observers shall not intervene in the procurement process but shall have right to submit their observation report to any relevant agency or body including their own organizations or associations;

(c)    receive, evaluate and make a selection of the bids received in adherence to this Act and guidelines as may be issued by the Bureau from time to time;

(d)    obtain  approval  of  the  approving  authority  before  making  an award;

(e)    debrief the bid losers on request;

(f)     resolve complaints and disputes if any;

(g)            obtain and confirm the validity of any performance guarantee;

(h)    obtain a “Certificate of ‘ No Objection’ to Contract Award” from the Bureau within the prior review threshold as stipulated in Section 3 (a) of this Act;

(i)     execute all Contract Agreements ; and

(j)     Announce and publicize the award in the format stipulated by this Act and guidelines as may be issued by the Bureau from time to time.

 

Accounting officer.

20.- (1) The accounting officer of a procuring entity shall be the person charged with line supervision of the conduct of all procurement processes; in the case of ministries the Permanent Secretary and in the case of extra-ministerial departments  and  corporations  the  Director-General  or  officer  of  co-ordinate responsibility.

(2)    The accounting officer of every procuring entity shall have overall responsibility for the planning of, organization of tenders, evaluation of tenders and execution of all procurements and in particular shall be responsible for:

(a)    ensuring compliance with the provisions of this Act by his entity and liable in person for the breach or contravention of this Act or any regulation made hereunder whether or not the act or omission was carried out by him personally or any of his subordinates and it shall not be material that he had delegated any function duty or power to any person or group of persons;

(b)    constituting the Procurement Committee and its decisions ;

(c)    ensuring that adequate appropriation is provided specifically for the procurement in the Federal budget ;

(d)    integrating his entity’s procurement expenditure into its yearly budget;

(e)    ensuring that no reduction of values or splitting of procurements is  carried out such as to evade the use of the appropriate procurement method;

(j)     constituting the Evaluation Committee ;

(g)    liaising with the Bureau to ensure the implementation of its regulations.

 

Procurement planning committee.

21.-(1) For    each   financial    year   each   procuring     entity   shall  establish    a Procurement Planning Committee.

(2)   The Procurement Planning Committee shall consist of

(a)    the accounting officer of the procuring entity or his representative who shall chair the Committee;

(b)    a representative of:

(i)     the procurement unit of the procuring entity who shall be the Secretary,

(ii)    the unit directly in requirement of the procurement,

(iii)    the financial unit of the procuring entity,

(iv)   the planning, research and statistics unit of the procuring entity,

(v)    technical personnel of the procuring entity with expertise in the subject Matter for each particular procurement, and

(vi)   the legal unit of the procuring entity.

 

Tenders board.

22.-(1) There is hereby established by this Act in each procuring entity tenders board (in this Act referred to as “the Tenders Board”).

(2)   Subject to the approval of the Council, the Bureau shall. from time to time  Tenders  prescribe guidelines for the membership of the Tenders Board.

(3)   The Tenders Board shall be responsible for the award of procurements goods, works and services within the threshold set in the regulations.

(4)   In all cases where there is a need for pre-qualification, the Chairman of the Tenders  Board  shall  constitute  a  technical  evaluation  sub-committee  of  the Tender Board charged with the responsibility for the evaluation of bids which shall be mad up of professional staff of the procuring entity and the Secretary of the Tender Board who shall also be the Chair of the Evaluation Sub-committee.

(5)    The decision of the Tenders Board shall be communicated to the Minister for implementation. Prequalification

 

Pre-qualification of bidders.

23.-(1) Where a procuring entity has made a decision with respect to the of bidders. minimum qualifications of suppliers, contractors or service providers by requesting! interested persons to submit applications, to pre-qualify, it shall  set  out  precise  criteria  upon  which  it  seeks  to  give  consideration  to  the Prequalification applications and in reaching decision as to which supplier, contractor or service of bidders provider qualifies, shall apply only the criteria set out in the prequalification documents and no more. Tenders board.

(2)     Procuring entities shall supply a set of prequalification documents to each supplier, contractor or consultant that request them, and the price that a procurement entity may charge for the prequalification documents shall reflect only the cost printing and provision to suppliers or contractors and consultants.

(3)    The prequalification document shall include:

(a)    instructions to prepare and submit prequalification application

(b)    a summary of the main terms and conditions required for the procurement contract to be entered into as a result of the procurement proceedings :

(c)    any documentary evidence or other information that must be submitted by the suppliers, contractors or consultants to demonstrate their qualifications :

(d)    the manner and place for the submission of applications to pre-qualify and the deadline for the submission, expressed as a specific date and time which allows sufficient time for suppliers, contractors or consultants to prepare and submit  their  applications,  taking  into  account  the  reasonable  need  of  the procuring entity ; and

(e)    any other requirement that may be established by the procuring entity in  conformity  with  this Act  and procurement regulations relating to the preparation and submission of applications to pre-qualify and  to  the prequalification proceedings.

(4)    The procurement entity shall respond to any request by a supplier, contractor or consultant for clarification of the prequalification documents if the request is made at least ten days before the deadline for the submission of applications to pre- qualify.

(5)    The response by the procuring entity shall be given within a reasonable time and in any event within a period of at most seven working days so as to enable the supplier, contractor or consultant to make a timely submission of its application to prequalify.

(6)    The response to any request that might reasonably be expected to be of interest to  other supplier, contractor or consultant shall, without identifying the source  of   the  request, be  communicated  to other  suppliers or contractors  or consultants provided with the prequalification documents by the procuring entity.

(7)     A procuring entity shall promptly notify each supplier, contractor or consultant which submitted an application to pre-qualify of whether or not it has been pre-qualified and shall make available to any member of the general public upon request, the names of the suppliers, contractors or consultants who have been pre-qualified.

(8)    Suppliers, contractors or consultants who have been pre-qualified may Participate further in the procurement proceeding.

(9)     The   procuring    entity  shall  upon    request  communicate       to  suppliers, contractors  or  consultants  who  have  not  been  pre-qualified,  the  ground  for disqualification.

(10) The procuring entity may require a supplier, contractor or service provider who has been pre-qualified to demonstrate its qualifications again in accordance with the same criteria used to pre-qualify the supplier, contractor or consultant.

(11) The procuring entity shall promptly notify each supplier, contractor or service provider requested to demonstrate its qualifications again whether or not the supplier, contractor or consultant has done so to the satisfaction of the procuring entity.

(12)  The procuring entity shall  disqualify any supplier, contractor  or  service provider who fails to demonstrate its qualification again if requested to do so.

PARTVI-PROCUREMENT METHODS (GOODSAND SERVICES)

Open competitive bidding.

24.-(1) Except as provided by this Act, all procurements of goods and works Open by  all  procuring    entities  shall  be   conducted    by   open   competitive bidding.

(2)    Any reference to open competitive bidding in this Act means the process by which  a  procuring  entity  based  on  previously  defined  criteria,  effects  public procurements       by   offering   to  every    interested    bidder   equal   simultaneous information  and opportunity to offer the goods and works needed.

(3)    The winning bid shall be that which is the lowest evaluated responsive bid which  has  been  responsive  to  the  bid  with  regards  to  work  specification  and standard.

 

 

PART VI – PROCUREMENT METHODS (GOODS AND SERVICES)

Invitations to bid.

25.- (1) Invitations to bid may be either by way of National Competitive Bidding or International Competitive Bidding and the Bureau shall from time to time set the Invitations monetary thresholds for which procurements shall fall under either system.

(2)   Every invitation to an open competitive bid shall:

(i)      in  the  case  of  goods  and  works  under  International  Competitive  Bidding,  the invitation for bids shall be advertised in at least two national newspapers and one relevant internationally recognised publication, any official websites of the procuring entity and the Bureau as well as the procurement journal not less than six weeks before the deadline for submission of the bids for the goods and works;

(ii)     in the case of goods and works valued under National Competitive Bidding, the invitation for bids shall be advertised on the notice board of the procuring entity, any official web sites of the procuring entity, at least two national newspapers, and in the procurement journal not less than six weeks before the deadline for submission of the bids for the goods and works.

 

Bid security.

26.-(1) Subject to the monetary and prior review thresholds as may from time to time be set by the Bureau all procurements valued in excess of the sums prescribed by the Bureau shall require a bid security in an amount not more than 2% of the bid price by way of a bank guarantee issued by a reputable bank acceptable to the procuring entity.

(2)            The Bureau shall from time to time specify the principal terms and conditions of the required bid security in the tender documents.

(3)            When the procuring entity, requires suppliers or contractors submitting tenders to provide a bid  security the requirement shall  apply to each supplier or Contractor Submission of

 

Submission of bids.

27.-(1) All bids in response to an invitation to open competitive bidding shall be submitted in writing and in addition to any other format stipulated in the tender documents, signed by an official authorized to bind the bidder to a contract and placed in a sealed envelop.

(2)            All submitted bids shall be deposited in a secured tamper-proof bid-box.

(3)    All bids submitted shall be in English language.

(4)    The procuring entity shall issue a receipt showing the date and time the bid was delivered. Bid security. Rejection of bids.

(5)   Any bid received after the deadline for the submission of bids shall not be opened and must be returned to the supplier or contractor which submitted it.

(6)            No communication shall take place between procuring entities and any supplier or contractor after the publication of a bid solicitation other than as provided in this Act.

 

Rejection of bids.

  1. A procuring entity may:

(a)    reject all bids at any time prior to the acceptance of a bid, without incurring thereby any liability to the bidders ; and

(b)    cancel the procurement proceedings in the public interest, without incurring any liability to the bidders.

 

Validity period of bids, modification and withdrawal of tenders.

29.- (1) The period of validity for a bid shall be the period specified in the tender documents.

(2)    A procuring entity may request suppliers or contractors to extend  the period of validity for an additional specified period of time.

(3)    A supplier or contractor may refuse the request for the extension of bid, in which case the effectiveness of its bid will terminate upon the expiration of the unextended period of effectiveness.

(4)    A supplier or contractor may modify or withdraw its bid prior to the deadline for the submission of bids.

(5)    The modification or notice of withdrawal is effective if it is received by the procurement entity before the deadline for the submission of tenders.

 

Bid opening.

  1. All bids shall be submitted before the deadline or date specified in the

tender documents or any extension of the deadline for submission and the procuring entity shall:

(a)    permit attendees to examine the envelopes in which the bids have been submitted to ascertain that the bids have not been tampered with ;

(b)    cause all the bids to be opened in public, in the presence of the bidders or their representatives and any interested member of the public;

(c)    ensure  that  the  bid  opening  takes  place  immediately  following  the deadline stipulated for the submission of bids or any extension thereof;

(d)    ensure that a register is taken of the names and addresses of all those present at the bid opening and the organizations they represent which is recorded by the Secretary of the tenders board ; and

(e)    call-over to the hearing of all present, the name and address of each bidder, the total amount of each bid, the bid currency and shall ensure that these details are recorded by the Secretary of the Tenders board or his delegate in the minutes of the bid opening.

 

Examination of bids.

  1. – (1) All bids shall be first examined to determine if they :

(a)    meet the minimum eligibility requirements stipulated in the bidding  documents

(b)    have been duly signed;

(c)    are substantially responsive to the bidding documents ; and

(d)    are generally in order.

(2)    A procuring entity may ask a supplier or a contractor for clarification of its bid submission in order to assist in the examination, evaluation and comparison of bids.

(3)    The following shall not be sought, offered or permitted

(a)    changes in prices ;

(b)    changes of substance in a bid ; and

(c)    changes to make an unresponsive bid responsive;

(4)    Notwithstanding sub-Section (3) of this Section, the procuring entity may correct purely        arithmetical errors that are discovered during the examination of tenders.

(5)    The procuring entity shall give prompt notice of the correction to the supplier or contractor that submitted the tender.

(6)    A major deviation shall result in a rejection of bid while a minor deviation shall be subject to clarification.

(7)    The following shall be considered as major deviations;

(a)    with respect to clauses in an offer;

(i)     unacceptable sub-contracting,

(ii)    unacceptable time schedule if time is of essence,

(iii)    unacceptable alternative design, and

(iv)   unacceptable price adjustment.

(b)    with respect to the status of the bidder

(i)     the fact that he is ineligible or not pre-qualified, and

(ii)    the fact that he is uninvited;

(c)    with respect to bid documents an unsigned bid :

(d)    with respect to time, date and location for submission

(i)     any bid received after the date and time for submission stipulated in the solicitation document,

(ii)    any bid submitted at the wrong location.

(8)    In cases of major deviations, bids shall not be considered any further and, where unopened, shall be returned as such to the bidder.

(9)    In all cases of rejection, a letter stipulating the reasons for rejection shall be sent, and the bidder shall not be permitted to amend his bid to become compliant.

(10) Subject to any provision to the contrary, the following shall be considered as minor deviations :

(a)    the use of codes:

(b)    the difference in standards;

(c)    the difference in materials;

(d)    alternative design;

(e)    alternative workmanship;

(f)     modified liquidated damages;

(g)    omission in minor items;

(h)    discovery of arithmetical errors;

(i)     sub-contracting that is unclear and questionable;

(j)     different methods of construction;

(k)    difference in final delivery  date;

(l)     difference in delivery  schedule;

(m)   completion period where these are not of essence;

(n)    non-compliance with some technical local regulation;

(o)    payment terms; and

(p)    any other condition that has little impact on the bid.

(11) In cases not mentioned above and where there exists a doubt as to whether a particular condition in a bid is a major or a minor deviation, the following rules shall apply:

(a)    where the impact on the costs is major, it shall be regarded as a major deviation ; and

(b)    where the impact on the costs is minor, it shall be regarded as a minor deviation.

(12) In cases of minor deviations, written clarification may be obtained from the supplier or contractor and, where applicable, an offer made for the correction of the minor deviation.

(13)  Where a supplier or contractor does not accept the correction of a minor deviation, his bid shall be rejected.

(14) At the stage of evaluation and comparison, all minor deviations shall be quantified in monetary terms.

(15)  For the rejection of a  bid, a written notice shall be  given  promptly to  the supplier.

 

Evaluation of bids.

32.-(1) For the evaluation and comparison of bids that have been adjudged as valid for the purposes of evaluation, no other method or criteria shall be used except those stipulated in the solicitation documents.

(2)    The objective of bid evaluation shall be to determine and select the lowest evaluated responsive bid from bidders that have responded to the bid solicitation.

(3)    In the course of its determination of the lowest evaluated responsive bid from the bidders that have responded to the bid solicitation the Tenders Board shall, in particular, undertake the following processes as applicable: .

(a)    checking of deviations ;

(b)    checking of omissions with quantification of same  (c) application of discounts, as applicable ;

(d)    clarification with bidders of questionable minor deviations;

(e)    quantification in monetary terms of such questionable deviations;

(j)     conversion to common currency;

(g)    calculation and tabulation of bid amount with domestic preference where  applicable;

(h)    determination of the lowest calculated prices in order of rank ;

(i)     post-qualification of bidders, where applicable;

(j)     listing of rejection of bids, where applicable ;

(k)    decision of rejection of all bids where justifiable;

(l)     recommendation for award ; and

(m)   writing up of the bid evaluation report.

(4)    All relevant factors, in addition to price, that will be considered for the purposes of bid evaluation and the manner in which such factors will be applied shall be stipulated in the solicitation documents.

(5)    Such factors shall be calculated in monetary terms as stipulated in the solicitation documents and shall include:

(a)    for  goods,  among  others,  costs  of  transportation  and  insurance,  payment schedule,  delivery  time,  operating  costs,  efficiency,  compatibility  of  the  equipment, availability of services and spare parts, related training, safety, environmental benefits or losses by damages;

(b)    for works, in addition to factors stipulated in Section 34 (1) of this Act, and subject to Section      34(2) of this Act, if time is a critical factor, the value of early completion; and

(c)    the value of early completion under Section 35(2) of this Act shall not be taken into account unless, in conformity with criteria pre-set in the bidding documents, the conditions of contract   provide for commensurate penalties in case of late delivery.

(6)    When bid prices are expressed in two or more currencies, the prices of all bids shall be converted to Nigerian currency, according to the rate and date of rate specified in the solicitation documents.

(7)    If suppliers were pre-qualified, verification of the information provided in the submission for prequalification shall be confirmed at the time of award of contract and award  may  be  denied  to  a  bidder  who  no  longer  has  the  capability  or  resources  to Successfully perform the contract.

(8)    After opening of bids, information relating to the examination, clarification and evaluation  of  bids  and  recommendations  concerning  award  shall  not  be  disclosed  to bidders  or  to  persons  not  officially  concerned  with  the  evaluation  process  until  the successful bidder is notified of the award.

 

Acceptance of bids.

33.-(1) The successful bid shall be that submitted by the lowest cost bidder from the bidders responsive as to the bid solicitation.

(2)    Notwithstanding subsection of: this Section, the selected bidder needs not be the lowest cost bidder provided the procuring entity can show good grounds derived from the provisions of this Act to that effect.

(3)    Notice of the acceptance of the bid shall immediately be given to the successful bidder;

 

Domestic preferences.

34.-(1) A procuring entity may grant a margin of preference in the evaluation of tenders when comparing tenders from domestic bidders with those from  foreign  bidders  or  when  comparing  tenders  from domestic suppliers offering goods manufactured locally with those offering goods manufactured abroad.

(2)    Where a procuring entity intends to allow domestic preferences, the bidding documents shall clearly indicate any preference to be granted to  domestic  suppliers  and  contractors  and  the  information  required  to establish the eligibility of a bid for such preference.

(3)    Margins  of  preference  shall  apply  only  to  tenders  under international competitive bidding.

(4)    The Bureau shall by regulation from time to time set the limits and the formulae for the computation of margins of preference and determine the contents of goods manufactured locally.

 

Mobilization fees.

35.-(1) In addition to any other regulations as may be prescribed  by the Bureau, a mobilization fee of not more than 15% may be paid to a supplier or contract or supported by the following:

(a)    in the case of National Competitive Bidding – an unconditional bank guarantee or insurance bond issued by an institution acceptable to the procuring entity ; and

(b)    in the case of International Competitive Bidding – an unconditional bank guarantee issued by a banking institution acceptable to the procuring entity.

(2)    Once a mobilization fee has been paid to any supplier or contractor, no further payment shall be made to the supplier or contractor without an interim performance certificate  issued  in  accordance  with  the  contract agreement.

 

 

Contract performance guarantee.

  1. The provision of a Performance Guarantee shall be a precondition for the award of any procurement contract upon which any mobilization fee is to be paid, provided however it shall not be less than 10% of the contract value in any case or an amount equivalent to the mobilization fee requested by the supplier or contractor whichever is higher.

 

Interest on delayed payments.

37.- (1) Payment for the procurement of goods, works, and services shall be settled promptly and diligently.

(2)    Any payment due tor more than sixty days from the date Of the submission of  the invoice,   valuation certificate or confirmation or authentication by the  Ministry, Extra-Ministerial Office,   government  agency, parastatal or corporation shall be deem a delayed payment.

(3)    All delayed payments shall attract interest at the rate specified in the contract document.

(4)    All contracts shall include terms, specifying the interest for late  payment of more than sixty days.

 

Record of procurement proceedings.

38.- (1) Every procuring entity shall maintain a record of the comprehensive

(2)    The portion of the record referred to in this Section shall. on request, be  made available to:

(a)    any person after a tender, proposal, offer or quotation has been accepted or after  procurement     proceedings have been terminated without resulting in a procurement contract; and

(b)    Suppliers, contractors or consultants that submitted tenders, proposals, offers or quotations. or applied for prequalification, after a tender, proposal, offer or quotation has  been accepted  or  procurement  proceeding  have  been  terminated without resulting in a procurement contract.

(3)    A disclosure of procurement proceeding records, prior to award of contract may be ordered by a court, provided that when ordered to do so by a court, the procurement entity shall not disclose such information, if its disclosure would

(a)    be contrary to law;

(b)    impede law enforcement; or

(c)    prejudice legitimate commercial interests of the parties.

(4)    The procuring entity shall not be liable to suppliers, contractors or service providers for damages     owing solely to failure to maintain a record of the procurement proceedings in accordance with this Section.

(5)    The records and documents maintained by procuring entities on procurement shall be made available for inspection by the Bureau, an investigator appointed by the Bureau and the Auditor-General upon request and where donor funds have been used for the procurement, donor officials shall also have access upon request to procurement files for the purpose of audit and review.

 

PART VII-SPECIALAND RESTRICTED METHODS OFPROCUREMENT

PART VII-SPECIAL AND RESTRICTED METHODS OF PROCUREMENT

Two stage tendering.

39.-(1) Notwithstanding the provisions of this Act, the Bureau may  issue Certificate of No Objection’ upon conditions hereinafter prescribed.

(2)    A procuring entity shall engage in procurement by two-stage tendering:

(a)    where it is not feasible for the procuring entity to formulate detailed specifications for the goods or works or, in the case of services. to identify their characteristics and where it seeks tenders, proposals or offers on various means of meeting its needs in  order to obtain the most satisfactory   solution to  its procurement needs;

(b)   where the character of the goods or works  are subject to rapid technological advances; where the procuring entity seeks to enter into a contract for research, experiment, study or development,     except where the contract includes the production of goods in sufficient quantities to establish their  commercial viability or to recover research and development costs, where the procuring entity applies this Act to procurement concerned with national security and  determines  that  the  selected  method is the most appropriate method of procurement; or

(c)    where the tender proceedings have been utilized but were not successful or the tenders were rejected by the procuring entity under an open competitive bid procedure  and  the  procuring  entity considers that engaging in new tendering proceedings will not result in a procurement contract.

(3)    The provisions of this Act as regards the process for open competitive bidding shall apply to two-stage tendering proceedings except to the extent that those provisions vary this Section.

(4)    The invitation documents:

(a)    shall call upon suppliers or contractors to submit, in the first stage of two stage tendering proceedings, initial tenders which contain their proposals without a tender price ; and

(b)    may solicit proposals that relate to technical, quality or other characteristics of the goods, works or services as well as contractual terms and conditions of supply and may stipulate the professional competence and technical qualifications of the

suppliers or contractors.

(5)    The procuring entity may, in the first stage, engage in negotiations with any supplier or contractor whose tender has not been rejected under an open competitive bidding procedure with respect to any aspect of its tender.

(6)    In the second stage of the two tender proceedings the procuring entity:

(a)    shall invite suppliers or contractors whose tenders have not been rejected to submit final tenders with prices on a single set of specifications;

(b)    may, in formulating the specifications, delete or modify any aspect of the technical or quality characteristics of the goods, works or services to be procedure together with any criterion originally set  out in these documents, evaluate and compare tenders and ascertain the successful tender;

(c)    may add new characteristics or criteria that conform with this Act:

(d)    shall communicate to suppliers or contractors in the invitation to submit firm tenders, any deletion, modification or addition; and

(e)    may permit a supplier or contractor who does not wish to submit a final tender to withdraw from the tendering proceedings.

(7)    The final tenders shall be evaluated and compared in order to ascertain the successful tender as defined in an open competitive bid.

 

Restricted tendering.

40.(1) Subject to the approval by the Bureau, a procuring entity may for reasons of economy and efficiency engage in procurement by means of restricted tendering if:

(a)    the goods, works or services are available only from a limited number of suppliers or contractors;

(b)    the  time  and cost required to examine and evaluate a large number of tenders is disproportionate  to  the  value  of  the  goods, works or services to be procured; or

(c)    the procedure is used as an exception rather than norm.

(2)    where a procuring entity engages in restricted tendering on the basis that:

(a)    the good works and services are available only from a limited number of suppliers or contractors, it shall invite tenders from all the suppliers and contractors who can provide the goods, works or services ; and

(b)    the time and cost required to examine and evaluate a large number of tenders is disproportionate to the value of the goods, works or services, it shall select in a non-discriminatory manner of the number of suppliers or contractors to ensure effective competition;

(3)    For the purposes of subsection (2), of this Section, the procuring entity shall cause a notice of the selected tendering proceedings to be published in the procurement journal.

(4)    The provisions of this Act regarding the open competitive bidding shall apply to the selective tendering proceedings, except to the extent that those provisions are varied by this Section.

 

  1. Request for quotations.

41.-(1) A procuring  entity  may  carry  out  procurements  by  requesting  for quotations from suppliers or contractors where the value of the goods or works to be procured does not exceed a sum that shall be set in the procurement regulation.

(2)    Generally quotations shall be obtained from at least 3 unrelated contractors or suppliers.

(3)    Each contractor or supplier from whom a quotation is requested shall;

(a)    be informed whether any factors other than the charges for the goods, works or services themselves, such as any applicable transportation and insurance charges, customs duties and taxes are to be included in the price; and

(b)    give only one quotation and shall not be allowed to change or vary the quotation.

(4)    No negotiation shall take place between a procuring entity and a contractor or supplier with respect to a quotation.

(5)    The procurement shall be awarded to the qualified contractor or supplier that gives the lowest priced responsive quotation.

(6)    Where the total value of the procurement is not more than a sum that shall be  set  in  the  regulation,  the  procurement  entity  may  not  obtain  the  Bureau’s approval.

 

Direct procurement.

42.-{1) A procuring entity may carry out any emergency procurement where:

(a)    goods, works or services are only available from a particular supplier or contractor, or if a particular supplier or contractor has exclusive rights in respect of the goods, works-or services, and no reasonable alternative or substitute exits; or

(b)    there is an urgent need for the goods, works or services and engaging in tender  proceedings  or  any  other  method  of  procurement  is  impractical  due  to unforeseeable circumstances giving rise to the urgency which is not the result of dilatory conduct on the part of the procuring entity; unforeseeable circumstances giving rise to the urgency which is not the result of dilatory conduct of the part of the procuring entity;

(c)    owing to a catastrophic event, there is an urgent need for the goods, works or services, making it impractical to use other methods of procurement because of the time involved in using those methods;

(d)    a procuring entity which has procured goods, equipment, technology or services from a supplier or contractor, determines that:

(i)     additional supplies need to be procured from that supplier or contractor because of standardization,

(ii)    there is a need for compatibility with existing goods, equipment, technology or services,  taking into account  the effectiveness of the original procurement in meeting the needs of the procurement entity,

(iii)    the limited size of the proposed procurement in relation to the original procurement provides justification,

(iv)   the reasonableness of the price and the unsuitability of alternatives to the goods or services in question merits the decision.

(e)    the procuring entity seeks to enter into a contract with the supplier or contractor for research, experiment, study or development, except where the contract includes the production of goods in quantities to establish commercial viability or recover research and development costs ; or

(f)     the procuring entity applies this Act for procurement that concerns national security, and determines that single-source procurement is the most appropriate method of procurement.

(2)    The procuring entity:

(a)    may procure the goods, works or services by inviting a proposal or price quotation from a single supplier or contractor.

(b)    shall include in the record of procurement proceedings a statement of the grounds for  its decision  and the circumstances in justification of single source procurement.

 

Emergency procurements.

 

43.-(1) A  procuring  entity  may  for  the  purpose  of  this Act,  carry  out  an emergency procurement where:

(a)    the country is either seriously threatened by or actually confronted with a disaster, catastrophe, war, insurrection or Act of God ;

(b)    the condition or quality of goods, equipment, building or publicly owned capital goods may seriously deteriorate unless action is urgently and necessarily taken to maintain them in their actual value or usefulness ; or

(c)    a public project may be seriously delayed for want of an item of a minor value.

(2)    In  an  emergency  situation,  a  procuring  entity  may  engage  in  direct contracting of goods, works and services.

(3)    All procurements made under emergencies shall be handled with expedition but along principles of accountability, due consideration being given to the gravity of each emergency.

(4)    Immediately after the cessation of the situation warranting any emergency procurement, the procuring entity shall file a detailed report thereof with the Bureau which shall verify same and if appropriate issue a Certificate of ‘No Objection’.

 

PART VIII-PROCUREMENT OFCONSULTANT (SERVICES)

Expressions of interest to provide services for ascertained needs.

  1. Where a procuring entity wishes to procure  services for its  needs to which are precise and ascertainable:

(a)    it shall solicit for expressions of interest or applications to pre-qualify to provide the services by publishing a notice to that effect in at least 2 national newspapers and the procurement journal;

(b)    where the value of the services to be procured is less than one million naira, or with the approval of the Bureau, of such a low value that only national consultants would be interested, the procuring entity may without placing any notice request at least 3 and not more than 10 consultants or service providers to make proposals for the provision of the services in a format stipulating:

(i)     a statement of qualifications  of the consultant to provide the  service:

(ii)    a statement of understanding of the procuring entity’s needs;

(iii)    the methodology for providing the service;

(iv)   the time frame for providing the service; and

(v)            the cost or fee for the service.

 

Request for proposals to provide services for unascertained needs.

45.-(1) A procuring entity wishing to procure services for its needs may do so by requesting for proposals when it intends to enter into a contract for the purpose of research, experiment, study or development, except where the contract includes the production of goods in quantities sufficient to establish their commercial viability or to recover research Request for and development cost.

(2)    The procuring entities shall procure the services of consultants by soliciting for expressions of interest by publishing a notice to that effect in 2 national newspapers and the procurement journal.

(3)    A procuring entity may make direct requests to a limited number of consultants. requesting proposals for the provision of a service if :

(a)    the services are only available from no more than 3 consultants:

(b)    the time and cost required to examine and evaluate a large number of proposals would be   disproportionate to the value of the services to be performed provided that it invites enough consultants to ensure transparent competition; or

(c)    it is in the interest of national defense and security or similar reason of confidentiality.

 

Content of the requests for proposals.

46.-(1) Request for proposals shall include:

(a)    the name and address of the procurement entity;

(b)    a requirement that the proposals are  to be prepared in the English proposals  language;

(c)    the manner, place and deadline for the submission of proposals ;

(d)    a statement to the effect that the procuring entity reserves the right to reject proposals ;

(e)    the criteria and procedures for the evaluation of the qualifications of the consultants;

(f)     the requirements on documentary evidence or other information that shall be submitted by consultants to demonstrate their qualifications ;

(g)    the nature and required characteristics of the services to be procured including the location where the services are to be provided and the time when the services are to be provided;

(h)    whether the procuring entity is seeking proposals on various possible ways of meeting its needs;

(i)     a requirement that the proposal price is to be expressed in Nigerian currency;

(j)      the manner in which the proposal price is to be expressed, including a statement on whether the price covers elements apart from the cost of services, such as reimbursement for transportation, lodging, insurance, use of equipment, duties or taxes;

(k)    whether the procedure to ascertain the successful proposal shall be based on the lowest cost or quality and cost or a combination of the lowest cost, quality and criteria other than cost but stipulated in the request for proposals; and

(l)     a short list to be made of only national consultants for consulting assignment,  contract  within  a  set threshold in the procurement regulation provided that national consultants possess such requisite skills.

(2)    The procuring entity shall provide the same information to every consultant requested to submit proposals.

 

Clarification and modification of requests for proposals.

47.-(1) A consultant shall be allowed to request for clarification on the  Clarification request  from  the  procuring  entity  and  such  request  may  be  made  within  a  and reasonable time to be specified.

(2)    A procuring entity may, whether on its initiative or as a result of a request for clarification by a consultant, modify the request for proposals by issuing  an  addendum  at  any  time  prior  to  the deadline  for  submission  of proposals.

(3)    The addendum shall be communicated promptly before the deadline for the submission of proposals to the short listed consultants to whom the procuring entity has provided the request for proposals and shall be binding on those consultants.

(4)    If the procuring entity convenes a meeting of consultants, it shall prepare minutes of the meeting containing the issues submitted at the meeting for clarification of the request for proposal and its responses to those issues, without identifying the sources of the requests for clarifications.

(5)    The minutes shall be provided promptly before the deadlines for the Submission of submission of proposals to the consultants participating in the selection Proposals proceedings to enable them  take the minutes  into account in prepare their proposals.

 

Submission of proposals.

  1. (1) the procuring entity shall allow sufficient time for the preparation and submission of the requested proposals but shall in no case give less than 30 days between the issue of the notice or request and the deadline for submission.

(2)   The technical and financial proposals shall be submitted simultaneously but in separate envelops.

(3)    A proposal received after the deadline for submission of proposals shall be returned to the sender unopened.

(4)    Immediately after the deadline for submission of proposals, the technical proposals shall be opened    for evaluation whilst the financial proposals shall remain sealed and kept in a secure bid-box until they are opened publicly.

(5)    The technical evaluation committee shall not have access to or insights to the financial proposals until the evaluations including any Tender Boards review are concluded.

 

Criteria for evaluation of proposals.

49.-(1) The procuring entity shall establish criteria to evaluate the proposals and prescribe the relative weight to be accorded to each criterion and the manner in which they are to be applied in the evaluation of:

(a)    the qualification experience reliability professional and managerial competence of the consultant or service provider and of the personnel to be  involved in providing the services ;

(b)    the effectiveness of the proposal submitted by the consultant or service  provider in meeting the needs of the procuring entity;

(c)    the proposal price, including any ancillary or related cost;

(d)    the effect that the acceptance of the proposal will have on the balance of payments position and  foreign reserves of the government, the extent of participation by local personnel, the economic development potential offered by the proposal, including domestic investment or other business activity, the encouragement of employment, the transfer of technology, the development of managerial, scientific and operational skills and the counter trade arrangements offered by consultant or service providers ; and

(e)    national defense and security considerations.

(2)    A procuring entity may accord a margin of preference for domestic consultants or service providers, which shall be calculated in accordance with the regulations and guidelines as issued from time to time by the Bureau and shall be reflected in the record of the procurement proceedings.

 

General selection procedure (services).

  1. (1) The procuring entity shall select the successful proposal by either choosing the proposal with:

(i)     the lowest evaluated price, or

(ii)    the best combined evaluation in terms of the general criteria set out in the request for proposals and the price quoted.

(2)    The  procuring  entity  shall  include  in  the  record  of  procurement  a statement of the grounds and circumstances on which it relied to select either of the procedures in subsection (I) of this Section.

(3)    Nothing in this Section shall prevent the procuring entity from resorting to the use of any impartial panel of experts to make the selection.

 

Procedure for selection of proposal where price is a factor.

51.(1) Where the procuring entity elects to choose the successful proposal Procedure based on technical and price factors, it shall establish a weight with respect to  selection quality  and  technical  price  factors  of  the  proposals  in  accordance  with  the of  criteria other than price as might have been set out in the request for proposals  and rate each proposal in accordance with such criteria and the relative weight price is and  manner  of  application  of  the  criteria  as  stipulated  in  the  request  for a factor proposals; and then;

(2)    The procuring entity shall compare the prices of those proposals that have attained a rating at or above the threshold;

(3)    The procuring entity shall notify the consultants whose proposals did not meet the minimum qualifying mark or were non responsive to the invitation  for proposals and terms of reference after the evaluation of quality is completed within a period of 14 working days after the decision has been taken by the procurement entity;

(4)    The name of the qualifying consultants, the quality scores for the technical  component  of  the  proposal  shall  be  read  aloud  and  recorded alongside the price proposed by each consultant or service provider when the financial proposals are opened;

(5)    The procuring entity shall prepare the minutes of public opening of financial proposals which shall be part of the evaluation report and shall retain this record.

(6)    The successful proposals shall be:

(a)    the proposals with the best combined evaluation in terms of the criteria established under subsection (I) of this Section from price in the case of quality  and cost-based selection ;

(b)    the proposals with the lowest price in the case of least-cost selection; or

(c)    the highest ranked technical proposal within the budget.

(7)    The Consultants with the winning proposal shall be invited for negotiations, which shall focus mainly on the technical proposals.

(8)    The proposed unit rates for staff-months and reimbursable shall not be negotiated unless there are exceptional reasons.

 

Selection procedure where price is not a factor.

52.-(1) Where the procuring entity elects to make a quality-based selection, based on consultant’s qualifications or single-source selection, it shall engage in negotiations with consultants in accordance with this Section.

(2)    The procurement entity shall:

(i)     establish a weight with respect to quality and price of the proposals;

(ii)    invite for negotiations on the price of its proposal, the Consultant  that has attained  the  best rating in accordance with subsection (1)  of  this Section;

(iii)    inform the Consultants that attained ratings above the weight that may be considered for negotiations if the negotiations with the consultant with the best rating do not result in a procurement contract; and

(iv)  inform the Consultant with the best rating, that it is terminating the negotiations if it becomes apparent to the procuring entity that the negotiations with that Consultant, invited under   subsection (b), will not result in a procurement contract.

(3)    The procuring entity shall, if negotiations with the consultant with the best rating fails, invite the Consultant that obtained the second best rating, and if the negotiations with that Consultant do not result in a procurement contract, the procuring entity shall invite the other suppliers or contractors for negotiations on the basis of their rating until it arrives at a contract or rejects the remaining proposals.

(4)    The procuring entity shall treat proposals and any negotiations on selection, procedure as confidential and avoid the disclosure of their contents to competing consultants.

 

PART IX-PROCUREMENT SURVEILLANCEAND REVIEW

Bureau to recommend investigation.

53.-(1) The Bureau may review and recommend for investigation by any relevant authority any matter   related to the conduct of procurement by a procuring entity, or the conclusion or operation of a procurement contract if it considers that a criminal investigation is necessary or desirable to prevent or detect a contravention of this Act.

(2)    The relevant authority may in the course of investigation:

(a)    require an officer, employee or agent of the procuring entity or bidder, supplier. contractor, or consultant to produce any books, records, accounts or documents ;

(b)    search premises for any books, records, accounts or documents:

(c)    examine and make extracts from and copies of books, records, accounts    or  documents    of  any   procuring entity, bidder, supplier, contractor or consultant;

(d)    remove books, records, accounts or documents of the procuring entity, bidder, supplier, contractor or consultant for as long as may be necessary  to examine them or make extracts from or copies of them but the investigator shall give a detailed receipt for the books, records, accounts or documents removed;

(e)    require an officer, employee or agent of the procurement entity or bidder, supplier, or contractor or consultant:

(i)     to explain an entry in the books, records, accounts or documents;

(ii)    to provide the investigator with information concerning the management or activities of the procurement entity or bidders as may be reasonably required;

(f)     explain an entry in the books, records, accounts or documents; and

(g)    provide the investigator with information concerning the management or activities of the procurement entity or bidders as may be reasonably required.

(3)    The Bureau may, pursuant to the advice of the procuring entity, results of its review of a procurement or report of investigation by a relevant government agency issue a variation order requiring a contractor at his own expense to repair, replace, or to do anything in his or her contract left undone or found to have been carried out with inferior or defective materials or with less skill and expertise than required by the contract of award.

(4)    The Bureau shall, if satisfied that there has been a contravention of this Act or any regulations in relation to procurement proceedings or procurement contracts, take action to rectify the contravention which action shall include:

(a)    nullification of the procurement proceedings;

(b)    cancellation of the procurement contract;

(c)    ratification of anything done in relation to the proceedings; or

(d)    a declaration consistent with any relevant provisions of this Act.

(5)    On completion of the investigation, the relevant authority shall if an offence is disclosed, take all necessary steps to commence prosecution and inform, the Bureau and the procurement entity accordingly, but where no offence is disclosed, the file shall be closed and the Bureau and procuring  entity shall be duly informed.

 

Administrative Review.

54.-(1) A bidder may seek administrative review for any omission or breach by a procuring or disposing entity under the provisions of this Act, or review any regulations or guidelines made under this Act or the provisions of bidding documents.

(2)    A complaint by a bidder against a procuring or disposing entity shall first be submitted in writing to the accounting officer who shall:

(a)    within fifteen working days from the date the bidder first became aware of the circumstances giving rise to the complaint or should have become aware of the circumstances, whichever is earlier;

(b)    on reviewing a complaint, the accounting officer shall make a decision in writing within 15 working days indicating the corrective measures to be taken if any, including the suspension of the proceedings where he deems it necessary and giving reasons for his decision ; or

(c)    where the accounting officer does not make a decision within the  period specified in sub-Section (2)(b).

(3)    The bidder is not satisfied with the decision of the accounting officer, the bidder may make a complaint to the Bureau within 10 working days from the date of communication of the decision of the accounting officer.

(4)    Upon receipt of a complaint, the Bureau shall promptly:

(a)    give notice of the complaint to the respective procuring or disposing entity and suspend any further action by the procuring or disposing entity until the Bureau has settled the matter ;

(b)    unless it dismisses the complaint:

(i)     prohibit a procuring or disposing entity from taking any further action;

(ii)    nullify in whole or in part an unlawful act or decision made by the procuring or disposing entity;

(iii)    declare the rules or principles that govern the subject matter of the complaint; and

(iv)   revise an improper decision by the procuring or disposing entity or substitute its own decision for such a decision.

(5)    Before taking any decision on a complaint, the Bureau shall notify all interested bidders of the complaint and may take into account representations from the bidders and from the respective procuring or disposing entity.

(6)    The Bureau shall make its decision within twenty-one working days after receiving the complaint, stating the reasons for its decisions and remedies granted, if any.

(7)    Where the Bureau fails to render its decision within the stipulated time, or the bidder is not satisfied with decision of the Bureau, the bidder may appeal  to the Federal-High Court within 30 days after the receipt of the decision of the Bureau, or expiration of the time stipulated for the Bureau to deliver a decision.

 

PART X-DISPOSALOFPUBLIC PROPERTY

PART X-DISPOSAL OF PUBLIC PROPERTY

Disposal of public property.

55.-(1)       This Section shall apply subject to the Public Enterprises (Commercialization and Commercialization) Act 1999.

(2)    For  the  purposes  of  this  Act  every  procuring  entity  shall  also  be disposing entity.

(3)    The open competitive bidding shall be the primary source of receiving offers for the purchase of any public property offered for sale.

(4)    The Bureau shall, with the approval of the Council:

(a)    determine the applicable policies and  practices in relation to the disposal of all public property;

(b)    issue guidelines detailing operational principles and organizational modalities to be adopted by all procuring entities engaged in the disposal of public property and

(c)     issue standardized document, monitor implementation, enforce compliance and set reporting standards that shall be used by all procuring entities involved in the disposal of public property.

(5)    For the purposes of this Act, public property is defined as resources in the form of tangible and non-tangible assets (ranging from serviceable to the unserviceable);

(a)    created through public expenditure;

(b)    acquired as a gift or through deeds;

(c)    acquired in respect of intellectual or proprietary rights;

(d)    acquired on financial instruments (including shares, stocks, bonds, etc); and

(e)    acquired by good will and any other gifts of the Federal Government.

(6)    The means of the disposal of public assets shall include:

(a)    sale and rental;

(b)    lease and hire purchase;

(c)    licenses and tenancies;

(d)    franchise and auction;

(e)    transfers from one  government department to another with or without financial adjustments; and

(f)     offer to the public at an authorized variation.

 

Planning of disposals.

56.-(1) Before  slating  any  public  property  for  disposal, the  accounting  officer (whether acting in his own authority or at the direction of any superior or other authority) in charge of any public property set for disposal shall authorize the  preparation  of a valuation  report  for  such property  by  an  independent Evaluator, or such professional with the appropriate competence to carry out the valuation.

(2)    The disposal of assets whether or not listed in the Assets register for a procuring entity shall be planned and integrated into the income and expenditure budget projection of the procuring entity.

(3)    The disposal of assets referred to in subsection (2) of this Section shall be timed to take place when the most advantageous returns can be obtained for the asset in order to maximize revenue accruing to the government.

(4)    AII procuring entities shall distribute responsibilities for the disposal of public property between the procurement unit and the Tenders Board.

 

PART XI – CODE OF CONDUCT

Code of conduct for public procurement.

57.(1) The Bureau shall, with the approval of the Council, stipulate a Code of Conduct for all public officers, suppliers, contractors and service providers  with regards to their standards of conduct acceptable in matters involving the procurement and disposal of public assets.

(2)    The  conduct  of  all  persons  involved  with  public  procurement, whether as official of the Bureau, a procuring entity, supplier, contractor or service provider shall at all times be governed by principles of honesty, accountability, transparency, fairness and equity.

(3)    All officers of the Bureau, members of Tenders Boards and other persons that may come to act regarding the conduct of public procurements shall subscribe to an oath as approved by Council.

(4)    All persons in whose hands public funds may be entrusted for whatever purpose should bear in mind that its utilization should be judicious.

(5)    Where a transaction involves the disposal of assets, principles of honesty, accountability, transparency, fairness and equity shall continue  to apply to the same extent as where it involves procurement.

(6)    These principles shall apply at all times, particularly when:

(a)    making requisition for or planning of procurements ;

(b)    preparing solicitation documents;

(c)    receiving offers in response to any form of solicitation towards a procurement or disposal ;

(d)    evaluating and comparing offers confidentially and in complete neutrality;

(e)    protecting the interest of all parties without fear or favor ; and

(f)     obviating all situations likely to render an officer vulnerable to embarrassment or undue influence.

(7)    All public officers shall handle public procurement and disposal of assets by:

(a)    ensuring adequate time for preparing offers;

(b)    complying with this Act and all derivative regulations ; and

(c)    receiving strict confidentiality until completion of a contract.

(8)    All public officers involved in public procurement and disposal of assets shall maintain the highest standards of ethics in their relationships with persons real or corporate who seek government commerce whether as a bidder, supplier, contractor or service provider by developing transparent, honest and professional  relationships with such persons.

(9)    Every public officer involved directly or indirectly in matters of public procurement and disposal of assets shall:

(a)    divest himself of any interest or relationships which are actually or potentially inimical or detrimental to the best interest of government and the underlining principles of this Act; and

(b)    not engage or participate in any commercial transaction involving the federal government, its  ministries, extra-ministerial departments, corporations where his capacity as public officer is likely to confer any unfair advantage – pecuniary or otherwise on him or any person directly related to him.

(10) Any person engaged in the public procurement and disposal of assets who has assumed, or is about to assume, a financial or other business outside business relationship that might involve a conflict of interest, must immediately declare to the authorities any actual or potential interest.

(11) Such a declaration shall be given such consideration at the relevant level as is necessary so that, where it is seen that remedial action is taken, a conflict of interest is present.

(12)  A conflict of interest exists where a person:

(a)    possesses an interest outside his official duties that materially encroaches on the time or attention   which should otherwise be devoted to affairs of government;

(b)    possesses a direct or indirect interest in or relationship with a bidder, supplier, contractor or service provider that is inherently unethical or that may be  implied or constructed to be, or make possible personal gain due to the person’s ability to influence dealings;

(e)    entertains relationships which are unethical, rendering his attitude partial toward the outsider for personal reasons or otherwise inhibit the impartiality of  the person’s business judgments ;

(d)    places by acts or omissions the procuring entity he represents or the Government in an equivocal, embarrassing or ethically questionable position;

(e)    entertains relationships compromising the reputation or integrity of the procuring entity he represents or the Government;

(f)     receives benefits by taking personal advantage of an opportunity that properly belongs to the procuring entity he represents or the Government;

(g)    creates  a  source  of  personal  revenue  or  advantage  by  using  public property which comes into his hands either in course of his work or otherwise ; and

(h)    discloses confidential information being either the property of his procuring entity, the Government or to a supplier, contractor or service provider to unauthorized persons.

(13) A person involved in the disposal of assets, shall not either by a third party or by himself be interested in any manner in buying directly or indirectly these assets and shall not have or obtain any type of advantage or revenue from the disposal for a period of three years after the disposal.

 

PART XII-OFFENCES

Offences relating to public procurement.

58.-(1) Any natural person not being a public officer who contravenes  any  provision of this Act commits an offence and is liable on conviction to a  term of imprisonment not less than 5 calendar years but not exceeding 10  calendar years without an option;

(2)    Any offence in contravention of this Act shall be tried by the Federal High Court.

(3)    Prosecution of offences under this Act shall be instituted in the name of the Federal Republic of Nigeria by the Attorney-General of the Federation or such other officer of the Federal Ministry of Justice as he may authorize so to do, and in addition, without prejudice to the Constitution of the Federal Republic of Nigeria 1999, he may:

(a)    after consultation with the Attorney-General of any state of  the federation, authorize the Attorney-General or any other officer of the Ministry of Justice of that state; or

(b)    if the relevant authority so requests, authorize any legal practitioner in Nigeria to undertake such prosecution directly or assist therein.

(4)    The following shall also constitute offences under this Act:

(a)    entering or attempting to enter into a collusive agreement, whether enforceable or not, with a supplier, contractor or consultant where the prices quoted in their respective tenders, proposals or quotations are or would be higher than would have been the case has there not been collusion between the persons concerned;

(b)    conducting or attempting to conduct procurement fraud by means of fraudulent and corrupt  acts, unlawful influence, undue interest, favor, agreement, bribery or corruption;

(c)    directly, indirectly or attempting to influence in any manner the  procurement process to obtain an unfair advantage in the award of a procurement contract;

(d)    splitting of tenders to enable the evasion of monetary thresholds set;

(e)    bid-rigging;

(f)     altering any procurement document with intent to influence the outcome of a tender proceeding;

(g)    uttering or using fake documents or encouraging their use; and

(h)    willful refusal to allow the Bureau or its officers to have access to  any procurement records.

(5)    Any person who while carrying out his duties as an officer of the Bureau, or any procuring entity who contravenes any provision of this Act commits an offence and is liable on conviction to a cumulative punishment of:

(a)    a term of imprisonment of not less than 5 calendar years without any option of fine; and

(b)    summary dismissal from government services.

(6)    Any legal person that contravenes any provision of this Act commits an offence and is liable on conviction to a cumulative penalty of:

(a)    debarment from all public procurements for a period not less than 5 calendar years; and

(b)    a fine equivalent to 25% of the value of the procurement in issue.

(7)    Where any legal person shall be convicted pursuant to subsection (4) of this Section, every director of the company as listed on its records at the Corporate Affairs Commission shall be guilty of an offence and is liable on conviction to a term of imprisonment not less than 3 calendar years but not exceeding 5 calendar years without an option of fine.

(8)    An alternation pursuant to subsection 4 (f) shall include:

(b)    insertion of documents such as bid security or tax clearance certificate which were not submitted at bid opening; and

(c)    request for clarification in a manner not permitted under this Act.

(9)    Collusion shall be presumed from a set of acts from which it can be assumed that there was an understanding, implicit, formal or informal, overt or covert under which each person involved reasonably expected that the other would adopt a particular course of action which would interfere with the faithful and proper application of the provisions of this Act.

(10) Bid-rigging pursuant to subsection 4(e) means an agreement between persons whereby:

(a)    offers submitted have been pre-arranged between them; or

(b)    their conduct has had the effect of directly or indirectly restricting free and open competition, distorting the competitiveness of the procurement process and leading to and escalation or increase in costs or loss of value to the national treasury.

(11) For the purposes of the presumption under Section 51 (7) of this Section, consideration shall  be given to a suspect’s ability to control the procurement  proceedings or to control a  solicitation or  the  conditions of  the contract in question, whether total or partial.

(12)  For the purposes of Section 59(5) of this Section, it shall be sufficient to prove that a reasonable business person should have known that his action would result in his company or firm having an  undue advantage over other bidders to the detriment of the national treasury.

PART XIII-MISCELLANEOUS

Miscellaneous.

59.-(1) The fixing of the seal of the Bureau shall be authenticated by the signature of the Chairman, the  Director-General or of any other person authorized generally or specially to act for that purpose by the Council.

(2)    Any contract or instrument which, if made or executed by a person not being a body corporate, would not be required to be under seal may be made or executed on behalf of the Bureau by the Director-General or any person generally or specially authorized to act for that purpose by the Council.

(3)    Any document purporting to be a document duly executed under the seal of the Bureau shall be received in evidence and shall, unless and until the contrary is proved. be presumed to be so executed.

(4)    The validity of any proceeding of Council or of a committee thereof shall not be adversely affected by any vacancy in the membership of the Councilor committee. or by any defect in the appointment of a member of the Council or of a Committee.  or by  reason that  a  person  not  entitled  to  do  so took  part in  the proceedings of the Council or Committee.

 

Interpretation.

  1. In this Act:

“Accounting officer” means the person charged with line supervision or the conduct of all procurement processes;

“Approving authority” means the person charged with overall responsibility for the functioning of a ministry, extra-ministerial department or corporation;

“Assets” includes tangible and intangible things which have been or may be sold or procured for consideration;

“Bid  security” means a form  of  security  assuring  the  bidder  shall  not withdraw a bid within the period specified for acceptance and shall execute a written contract within the time specified in the bid;

“Debar” means the placing of a firm company or natural person on a list of person ineligible to participate in any procurement proceedings under this Act;

“Certificate of No Objection” means the document evidencing and authenticating that due process and .the letters of this Act have been followed in the conduct of a procurement proceeding and allowing for the procuring entity to enter into contract or effect payments to contractors or suppliers from the treasury;

“Contract” means an agreement entered in writing;

“Contractor or supplier” means any potential party to a  procurement contract with the  procuring entity and  includes any corporation, partnership,  individual, sole proprietor, joint stock company, joint venture or any other legal entity through which business is conducted; “Excessive price” means a monetary value proposed by a bidder for any procurement which is in the estimation of the Bureau unreasonable and injudicious after consideration of the actual value of  the item in question plus all reasonable imputations of cost and profit;

“Goods” means objects of every kind and description including raw materials, products and equipment and objects in solid, liquid or gaseous form and electricity as well as services incidental to the supply of the goods;

“Interim Performance Certificates” means evidence that a contractor or supplier as performed its obligations under a procurement contract up to a level stipulated by the contractor but not meaning completion;

“International Competitive Bidding” means the solicitation of bids from both domestic and foreign contractors and suppliers;

“Lowest evaluated responsive bid” is the lowest price bid amongst the bids that meets all the technical requirements and standards as contained in the tender document.

“Margin of Preference” means the extra mark up on price allowed any domestic contractor or supplier bidding under International Competitive Bidding without being otherwise disadvantageous to the bid in terms of price;

“Minor Value” means a monetary value which is not in excess of the monetary thresholds set for any approving authority by the Bureau;

“Monetary Threshold” means the value limit in Naira set by the Bureau outside of which an approving authority may not award a procurement contract;

“National Competitive Bidding” means  the  solicitation  of  bids  from  domestic contractors and suppliers registered or incorporated to carry on business under Nigeria Law;

“Negotiation” means discussions to determine the terms and conditions of a contract or procurement ;

“Open Competitive Bidding” means the offer of prices by individuals or firms competing for a contract, privilege or right to supply specified goods, works, construction or services ;

“Procurement” means acquisition;

“Procurement  proceedings” means  the  initiation  of  the  process  of  effecting  a procurement up to award of a procurement contract;

“’Procuring entity” means any public body engaged in procurement and includes a Ministry, Extra-Ministerial office, government agency, parastatal and corporation;

“Public Procurement” means the acquisition by any means of goods, works or services by the government;

“Relevant authority” includes Economic and Financial Crimes Commission and Independent corrupt Practices Commission;

“Services” means the rendering by a contractor or supplier of his time and effort and includes any object of procurement other than goods, works or construction;

“Solicitation Documents” means the bid solicitation documents or any  other documents for solicitation of offers proposals or quotations;

“Special Purpose Goods”  means any objects of  armaments ammunition mechanical  electrical  equipment  or  other thing as  may be  determined  by  the President needed by the Armed Forces  or Police Force as well as the services incidental to the supply of the objects;

“Substantially  Responsive” means  the  response  to  bid  solicitations which virtually answers  to  all  the  needs  of  a  procuring  entity  as  stipulated  in  the  bid solicitation documents;

“Supplier” means a real or legal  person  that   provides  supply of  goods, contracting of works or consultants;

“Threshold” refers only to the approving and not the actual process of ward;

“Validity  Period”  means  the  period  during  which  a  bidder  agrees  not  to  increase the cost of its bid or to remove any components of the bid;

“Works” means all  works  associated  with  the  construction, reconstruction, demolition,  repair  or  renovation  of  a  building, structure  or  works,  such  as  site Short  title preparation, excavation, erection, building, installation of equipment or materials, decoration and finishing, as well as  services  incidental  to  construction  such  as  drilling, mapping, satellite photography, seismic investigation and similar services provided pursuant to the procurement of contract, where the value of those services  does not exceed that of the construction itself.

 

Citation

  1. This Act may be cited as the Public Procurement Act, 2007.

 

 

 

 

 

 

 

 

 

error: Our Content is protected!! Contact us to get the resources...

Subscribe To Our Newsletter

Subscribe!